Step 1
Pre-visit confirmation
- Confirm visit slot, address, package scope, and who will be present on-site.
- Confirm technician kit readiness before leaving for the job.
- Call the customer before arrival to reduce no-shows and confusion.
Aegis Operations
This page now starts with the short, must-follow SOP for live jobs. The full hiring, training, and QA readiness program remains below as the scale-up layer for later.
Short must-follow workflow for live Aegis jobs. This is the operating default for an early-stage team and covers only the non-negotiable field controls.
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Reference checks for the longer readiness program kept below for future scale-up.
100
Scorecard Weight Total
14
Training Days
9
Field QA Checklist Items
18
Field QA Max Score
Scorecard weight validation passed (100/100).
Training day validation passed (14-day curriculum).
Scale-up reference with weighted domains and minimum gate of 3/5 in every domain.
| Domain | Weight | Test Method | Minimum Gate |
|---|---|---|---|
| Installation quality (grab bars, raised seat, anti-slip) | 35 | Practical install on mock setup | 3/5 |
| Safety + geriatric sensitivity | 20 | Risk spotting, placement logic, dignity handling | 3/5 |
| Customer communication | 20 | Role-play with buyer and elder | 3/5 |
| SOP discipline (OTP, checklist, documentation) | 15 | Process simulation | 3/5 |
| Digital fluency (CRM/app/payment capture) | 10 | App workflow execution | 3/5 |
Longer-form admission checks retained for future technician scaling.
Duration: 45 minutes
Validate installation quality and technical discipline.
Duration: 20 minutes
Validate risk recognition and mitigation judgment.
Duration: 15 minutes
Assess dignity-first customer communication.
Duration: 15 minutes
Assess execution of required digital workflow.
Detailed pre-deployment curriculum kept as a secondary readiness reference.
Day 1
Technician understands package-first model and customer behavior standards.
Day 2
Technician can identify high-risk movement zones and support needs.
Day 3
Technician can choose suitable tools and anchor methods by wall type.
Day 4
Technician can map and justify placement for practical daily movement.
Day 5
Technician can install support accessories to specification.
Day 6
Technician can prepare surfaces and apply anti-slip safely and evenly.
Day 7
Technician can execute full SOP without missed checkpoints.
Day 8
Technician can close jobs with clean digital and payment records.
Day 9
Technician can handle concerns and escalate correctly when needed.
Day 10
Technician can explain attestation context without medical over-claiming.
Day 11
Technician observes real workflows and audit expectations.
Day 12
Technician leads installation under live supervision.
Day 13
Technician passes technical and process certification gates.
Day 14
Technician is assigned deployable status and tier.
Scale-up QA model with scoring, critical-failure triggers, and retraining logic.
Slot adherence, kit readiness, and customer pre-call completed.
ID shown and arrival OTP verified correctly.
Risk points logged with placement rationale.
Alignment, load stability, finish quality, no sharp edges.
Site cleaned, debris removed, no new hazard introduced.
Walkthrough completed and completion OTP verified.
Payment mode and proof captured correctly.
Usage guidance explained clearly to elder and family.
Grievance path and support contacts explained.
Soft launch cadence and non-negotiable response playbooks.
| Week | Milestone | Target |
|---|---|---|
| Week 1 | Hire and assess initial technician cohort | Assess first 10 candidates with scorecard and practical tests |
| Week 2 | Training phase part 1 | Complete days 1 to 7 for full cohort |
| Week 3 | Training phase part 2 and certification | Complete days 8 to 14 and assign L1 or L2 deployment tier |
| Week 4 | Soft launch with strict audit | Run 100 percent QA coverage on first 30 jobs per technician |
Operational finish line for deployment readiness.
Examples for internal object shape and downstream integration tests.
{
"name": "Rohit Patil",
"city": "Mumbai",
"languages": [
"English",
"Hindi",
"Marathi"
],
"experience_years": 4,
"background_verified": true
}{
"candidate_id": "cand-001",
"technical_score": 4,
"safety_score": 4,
"communication_score": 3,
"sop_score": 4,
"digital_score": 3,
"total_weighted_score": 78,
"status": "PASS"
}{
"technician_id": "tech-001",
"day_completed": 7,
"trainer_id": "trainer-01",
"module_status": "COMPLETED",
"module_name": "SOP day: arrival OTP, completion OTP, documentation"
}{
"order_id": "AEG-0001",
"audit_score": 17,
"critical_failures": [],
"corrective_action_due_date": "2026-03-10",
"auditor_id": "qa-01"
}{
"technician_id": "tech-001",
"tier": "L1",
"status": "CERTIFIED",
"certified_on": "2026-03-01",
"next_review_due": "2026-09-01"
}